Upgrading the existing plant by replacing a primary crusher with a C130 jaws crusher, and by replacing the secondary crusher with an NP-15 hammer crusher, as well as changing the location of the secondary crusher of the plant.
The upgrade was performed by the M. bar Maintenance Ltd. team.