Upgrade of the existing system by replacing the primary crusher with a C130 jaw crusher,
and replacing the secondary crusher with NP-15 hammers, as well as changing the location of the secondary crushing in the system.
The upgrade was performed by the team of M.Bar Maintenance Ltd.